Surfaces should be clean, dry, and free of frost. When re-glazing, remove all old putty and bedding. If necessary, place glazing in hands and roll into coils to warm and soften. Smooth glazing to an angle that sheets water. Typical dry time before painting is four to six weeks, depending on temperature and humidity. Putty must be painted after it has skinned over and attained a firm set. For best results, use a high quality oil-based paint.
Technical Data: Meets the requirements of Federal Specification TT-G-410E; ASTM C 669-75, C669, D2249, D2376, C797.